Tuesday, August 10, 2010

Tar paper, Tyvec, and two windows!

We passed the sheathing inspection and have begun installing the tar paper, Tyvec, and windows. The new gable wall is the furthest along in this process, with Tyvec, tar paper, and both windows installed. The front half of the roof has also been tar-papered.