Sunday, February 6, 2011

We have a room 99% finished!

We've come a long way since the end of November, when the second bedroom looked like this. We also took three weeks off around Christmas due to the holidays, the weather, etc.

Since then we spackled, sanded, spackled some more, primed, painted, cut/painted/installed trim, ordered carpet, installed the electrical outlets/switches, hung the ceiling fan, and put up the blinds. Here's what it looks like as of this morning:

Before the township comes on Tuesday to sign off on this room, the closet door needs to be painted and hung, and two small pieces of trim need to be added under one of the windows. I also have a few painting touch ups on the walls and trim. Below you can see the closet in its current doorless state.

The walls are Sea Sprite and the door/trim are Ultra Pure White (both by Behr). The ceiling fan is the 44 inch Auberville by Hunter in brushed nickel. Carpet is a remnant that we got from World Wide Flooring. Floor registers are from Signature Hardware's Whittington Collection in brushed nickel. Blinds are 2 inch faux wood in white from Home Depot.

Time for me to grab some paint brushes and respirator and work on the closet door.

No comments:

Post a Comment